Skip to content

Construction Budget Basics

Launch Feature

Start with area and cost per square foot. Add other project costs to see what belongs in the total.

From area to total cost

Review the starting assumptions, inspect the hard-cost calculation, then add other project costs.

Fixed illustrative figures. Select a chapter to focus on a step in the calculation.

Follow the budget

1 / 3 · Budget overview

From area to total cost.

Area
10,000 SF
Hard cost / SF
$185
Other project costs
$650,000

Area × cost/SF = hard cost

10,000 SF × $185/SF = $1,850,000

Hard cost + other costs = total cost

$1,850,000 + $650,000 = $2,500,000

Fixed illustrative figures

Fixed construction-budget illustration. The stated scope omits detailed timing and other underwriting costs; these are not current local prices.

Use ← → keys to move between chapters

Review the assumptions

Fixed construction-budget illustration. The stated scope omits detailed timing and other underwriting costs; these are not current local prices.

Area

Define the area covered by the estimate and use the same area basis as the unit cost.

Cost per square foot

Keep the scope and source of the unit cost with the assumption.

Other project costs

Add the costs outside this simplified hard-cost estimate to understand the total.

Use your own assumptions

Start Modeling